The Total Cost of Your Current Tubing Anchor Catcher Equipment
Please provide the details below to help determine how much time and money is spent managing anchors.
Production losses due to downtime (bbls/yr)
7,000
Production losses due to downtime
$7,000
Workover costs related to stuck anchors
$7,000
Workover costs related to gas locking
$7,000
The Business Benefits of the TechTAC® Slimline®
These fields summarize some of the benefits TechTAC® customers have realized by switching from standard B2 anchors to the Slimline®. The pre-populated percentages are used in the ROI calculations below and represent a conservative estimate of the resulting benefits.
The Return on Investment of Switching to the Slimline® TAC
Based on your inputs above, the data below compares the incremental cost and resulting business benefits (through increased production, less downtime, etc.) of switching all of your wells from standard B2 anchors to Slimline® TACs. The return on investment, or ROI, shows the overall net gain to your company from making the switch.
TechTAC® Business Benefit
TechTAC® 1-Year Business Benefit Summary
|
|
|
Results
|
Production gains with reduced downtime (bbls/year)
|
|
|
|
Production gains with reduced downtime
|
|
|
|
Cost savings from reducing the instances of stuck anchors and the time to pull them
|
|
|
|
Cost savings from reducing the instances of gas locking
|
|
|
|
Total 1-Year Business Benefit
|
|
|
|
|
|
|
|
|